A newcomer to Australian solar, Indonesia’s Terregra Renewables, has appointed Balance Utility Solutions to carry out EPC activities on a 5 MW solar farm north of Murray Bridge in South Australia.

The 5 MW Mobilong Solar Farm has been developed by Terregra Renewables, a subsidiary of the listed Indonesian company PT Terregra Asia Energy Tbk.

Location:
Mobilong, Murray Bridge, South Australia
Project:
Mobilong Solar Farm for Terregra
Solution:
5 MW Solar Farm
Mobilong Solar Farm


The project will feature about 16,100 PV modules and two containerized inverters. With around 40 jobs created during construction, work is pencilled in for completion in April or May 2019.

Underground trenching works as well as the excavations for major equipment have been complete, all in preparation for the concrete foundation works to soon take place.

Balance is delighted to be working with Terregra Renewables on the delivery of their first solar project in Australia

Rod Hayes, Managing Director of Balance. Noting that the two companies have developed a close working relationship through project development and now into delivery.