Mobilong Solar Farm
A newcomer to Australian solar, Indonesia’s Terregra Renewables, appointed Balance Utility Solutions to carry out EPC activities on a 5 MW solar farm north of Murray Bridge in South Australia.
The 5 MW Mobilong Solar Farm has been developed by Terregra Renewables, a subsidiary of the listed Indonesian company PT Terregra Asia Energy Tbk.
- Location:
- Mobilong, Murray Bridge, South Australia
- Project:
- Mobilong Solar Farm for Terregra
- Solution:
- 5 MW Solar Farm
- Commissioned:
- July 2019
“
This is a great achievement for Terregra Renewables and is our first operating project in Australia. It was pleasing to see so many high-quality local businesses involved in the project.
Director of Terregra Renewables Graham Pearson said in a statement.